Thanks for the reply Cypress. Do you have some experience in this field? So what happened with the Deep Water Horizons? If it had double BOP, and each is double redundant, and all tested monthly. Why did all 4 fail?

Link to comment
Share on other sites

I am working in Deepwater Technology Deployment for an E&P company, not BP though. Our group focuses on providing our project groups with systems, designs and processes indended to prevent what happened at Macondo so we are watching this closely. I have supported Drilling and Completion Operations in the past though not currently. The top BOP is an annulus BOP that is designed to hold back moddest pressures to prevent the well control fluid and high density mud from being pushed out of the well by a "gas kick" while drill pipe is in the well. If a gas kick is not noticed in time, then the annulus BOP quickly becomes inneffective.

 

In the case of the Macondo well, gas broke out the backside of the production casing and into the well due to a failed cement procedure most likely due to poor design and process decisions by BP engineering managers. The gas quickly forced a significant amount of well control fluid out of the well and wellhead pressures rose beyond the ability of the annulus BOP before the immediate problem was realized. The ram BOP is designed to shear off the drill pipe, and it was tripped but it failed to shear off what was obstructing the BOP. There is speculation that the production casing was driven back up into the BOP by the gas kick and it prevented the shears from functioning. A design decision was made to forego use of a casing ring lock that is intended to prevented upward casing travel and a casing seal that would have prevented flow up the backside.

 

In addition the BOP tests did uncover a couple minor failures of portions of the backup deployment controls, but project managers chose to move forward without making repairs to the BOP. It is unlikely that this had a significant impact but you never know.

 

BOP's will function if the system is properly designed and all the prior conditions are met necessary to allow them to function. In the case of the Macondo well, design and process issues were the root drivers and the BOP's cannot substitute for poor decisions.

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.